Icon
Our latest projects

Pipeline Projects

We have developed a wide portfolio of satisfied government, local and foreign commercial clients who recognize and depend on the quality of our services.


Brief: The implementation of the gas pipeline 48 knots Ebadan- Basra line

Client: Oil Projects Company

Brief: Executed many flow lines 6”, 8″10”,14”

Client: South Oil Company (SOC)

Brief: Executed flow line and fabrication works in left water station and injection water station west Qurna

Client: FluorExxonmobile

Brief: Brief: Maintance and , cutting, installing and welding spools and flanges in manifold 7/2 in West Qurna DS7

Client: FluorExxonmobile

Brief: Fabricate, welding works and installation works and flow line in Electrical Power Station in Qurna North Basrah Capacity 50MW

Client: Ministry of Electricity

Brief: We have flow lines works some it’s executed and some continue in execute 6”-12′

Client: Subcontractor With ALJAZEEL, Co. Client: Exxon Mobile

Brief: Executed flow line 20” ,24” and fabrication works in West Qurna2 (W.Q2)

Client: Lukoil

Brief:Executed Boring Machine Projects(Jacking) from 8″ to 32″ in W.Q2′

Client: Lukoil

Brief: fabricate works to transfer pipe 16” GTU in Zubair Mushref it is coming from Injection Water Station.

Client: South Oil Company (SOC)

Brief: Boring Machine and Cold Bend Works in Majnoon Field Basrah

Client: CCPC-NAJRAN Co. CLIENT SHELL CO.

Brief: Fabricate and Welding Works For provision of pipeline Pre- Commissioning support and intelligent Pig inspection services. pipe 40”,8” (Pig inspection services) contract No. SIGUP-12-097. And Construction Base Pad

Client: Basrah Gas Company (BGC)

Brief:Supplying and Installation of Water Treatment Unit with 800mx3/h Capacity

Client: Water directorate of Basrah

Brief:Supplying and Installation of Water Treatment Unit with 200mx3/h Capacity

Client: Water directorate of Basrah